< Back To ProjectsPedestrian Bridge – Emerald

Scope of Work: 22M Span Truss Pedestrian Bridge
Key Elements: Design and fabricate a 22m span pedestrian bridge including abutments

The bridge was a typical steel Warren truss design, with timber decking and combined handrail/balustrade panel. The bridge had a painted finish with the rails being hot dip galvanised. DWW also supplied the designs for the abutments that were used to support the bridge.

  • Design and RPEQ certify a 22 x 2m bridge including abutment designs
  • Create detailed fabrication workshop drawings
  • Protective coat the steelwork in a combination of HDG and anti-graffiti paint systems
  • Deliver to site